Voltronic Power Solutions

Voltronic Power LIO-II-4810-LITHIUM-BATTERY-PACK-LIOII-4810

The LIO II 4810 Lithium Battery Pack LIOII-4810 is a lithium battery rated LIOII-4810.

Models Covered: LIO-II-4810-LITHIUM-BATTERY-PACK-LIOII-4810

Manufacturer: Voltronic Power

Application: The LIO II 4810 Lithium Battery Pack LIOII-4810 is a lithium battery rated LIOII-4810. Every figure on this page is read from the manufacturer's manual for the LIO II 4810 Lithium Battery Pack series.

Technical Specifications

Technical Specifications
Parameter LIO-II-4810-LITHIUM-BATTERY-PACK-LIOII-4810
Protection Features
Protection Features BMS
Certification / Compliance Safety UN38.3, IEC 62619, EN 61000-6-3 EN 61000-6-1, UKCA
Battery Data
Standard Charge/Discharge Current 0.2C CC (Constant Current) charge to FC, CV (Constant Voltage) charge till charge current decline to <0.05C
Nominal Capacity 100 Ah
Max Discharge Current 150 A
Peak Discharge Current 192 A at 1min
Max Charge Current 100 A (Default 30A)
Additional Specifications
Inner Resistance <20ΜΩ
Capacity (Wh) 5120 Wh
Dimension with stand feet 185 x 540 x 530
Communication
Communication Interface RS485 (RJ45), extension port (RJ11)
Electrical / AC Output Data
Nominal Voltage 51.2 VDC
Full Charge Voltage 56 V ± 0.1 V
Full Discharge Voltage 42 V
Max Charging Voltage 56 V ± 0.1 V
Mechanical Data
Dimensions (W×H×D) 185 x 540 x 420
Net Weight 48
Operating Conditions
Operating Temperature Charge: 0°C~50°C Discharge: 0°C~50°C
Storage Temperature Range -20ºC ~ 60 °C 20°C±5°C is the recommended storage temperature

Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.

Availability & grid compliance in Yemen

Market Yemen
Grid authority / regulator Public Electricity Corporation (PEC), Ministry of Electricity and Energy
Quotation currency YER
Support hours timezone Asia/Aden
Delivery & installation coverage Sana'a, Aden, Taiz, Al Hudaydah, Mukalla

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Yemen that is Public Electricity Corporation (PEC), Ministry of Electricity and Energy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.