Voltronic Power LIO-II-4810-LITHIUM-BATTERY-PACK-LIOII-4810

The LIO II 4810 Lithium Battery Pack LIOII-4810 is a lithium battery rated LIOII-4810. Every figure on this page is read from the manufacturer's manual for the

Models Covered: LIO-II-4810-LITHIUM-BATTERY-PACK-LIOII-4810

Manufacturer: Voltronic Power

Application: The LIO II 4810 Lithium Battery Pack LIOII-4810 is a lithium battery rated LIOII-4810. Every figure on this page is read from the manufacturer's manual for the LIO II 4810 Lithium Battery Pack series.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter LIO-II-4810-LITHIUM-BATTERY-PACK-LIOII-4810
Electrical / AC Output Data
Nominal Voltage 51.2 VDC
Full Charge Voltage 56 V ± 0.1 V
Full Discharge Voltage 42 V
Internal Resistance <20ΜΩ mΩ
Max Charging Voltage 56 V ± 0.1 V
Battery Data
Nominal Capacity 100 Ah
Usable Energy 5120 Wh kWh
Max Charge Current 100 A (Default 30A)
Max Discharge Current 150 A
Peak Discharge Current 192 A at 1min
Standard Charge/Discharge Current 0.2C CC (Constant Current) charge to FC, CV (Constant Voltage) charge till charge current decline to <0.05C
Protection Features
Certification / Compliance Safety UN38.3, IEC 62619, EN 61000-6-3 EN 61000-6-1, UKCA
Protection Features BMS
Mechanical Data
Dimensions (W×H×D) 185 x 540 x 420 mm
Net Weight 48 kg
Operating Conditions
Operating Temperature Charge: 0°C~50°C Discharge: 0°C~50°C
Storage Temperature Range -20ºC ~ 60 °C 20°C±5°C is the recommended storage temperature
Communication
Communication Interface RS485 (RJ45), extension port (RJ11)

Note: Specifications are based on the official Voltronic Power LIO-II-4810-LITHIUM-BATTERY-PACK-LIOII-4810 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Iraq

Market Iraq
Grid authority / regulator Ministry of Electricity Iraq
Quotation currency IQD
Support hours timezone Asia/Baghdad
Delivery & installation coverage Baghdad, Basra, Erbil, Mosul

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Iraq that is Ministry of Electricity Iraq. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.