Voltronic Power Solutions

Voltronic Power LIO-II-4810-LITHIUM-BATTERY-PACK-LIOII-4810

The LIO II 4810 Lithium Battery Pack LIOII-4810 is a lithium battery rated LIOII-4810.

Models Covered: LIO-II-4810-LITHIUM-BATTERY-PACK-LIOII-4810

Manufacturer: Voltronic Power

Application: The LIO II 4810 Lithium Battery Pack LIOII-4810 is a lithium battery rated LIOII-4810. Every figure on this page is read from the manufacturer's manual for the LIO II 4810 Lithium Battery Pack series.

Technical Specifications

Technical Specifications
Parameter LIO-II-4810-LITHIUM-BATTERY-PACK-LIOII-4810
Protection Features
Protection Features BMS
Certification / Compliance Safety UN38.3, IEC 62619, EN 61000-6-3 EN 61000-6-1, UKCA
Battery Data
Standard Charge/Discharge Current 0.2C CC (Constant Current) charge to FC, CV (Constant Voltage) charge till charge current decline to <0.05C
Nominal Capacity 100 Ah
Max Discharge Current 150 A
Peak Discharge Current 192 A at 1min
Max Charge Current 100 A (Default 30A)
Additional Specifications
Inner Resistance <20ΜΩ
Capacity (Wh) 5120 Wh
Dimension with stand feet 185 x 540 x 530
Communication
Communication Interface RS485 (RJ45), extension port (RJ11)
Electrical / AC Output Data
Nominal Voltage 51.2 VDC
Full Charge Voltage 56 V ± 0.1 V
Full Discharge Voltage 42 V
Max Charging Voltage 56 V ± 0.1 V
Mechanical Data
Dimensions (W×H×D) 185 x 540 x 420
Net Weight 48
Operating Conditions
Operating Temperature Charge: 0°C~50°C Discharge: 0°C~50°C
Storage Temperature Range -20ºC ~ 60 °C 20°C±5°C is the recommended storage temperature

Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.

Availability & grid compliance in Sudan

Market Sudan
Grid authority / regulator Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum
Quotation currency SDG
Support hours timezone Africa/Khartoum
Delivery & installation coverage Khartoum, Omdurman, Port Sudan, Kassala, Nyala

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Sudan that is Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.