Voltronic Power Solutions

Voltronic Power ALFA-3/5KVA

The ALFA 3KVA is a solar inverter rated 3KVA. Every figure on this page is read from the manufacturer's manual for the ALFA series.

Models Covered: ALFA-3KVA, ALFA-5KVA

Manufacturer: Voltronic Power

Application: The ALFA 3KVA is a solar inverter rated 3KVA. Every figure on this page is read from the manufacturer's manual for the ALFA series.

Technical Specifications

Technical Specifications
Parameter ALFA-3KVAALFA-5KVA
Electrical / AC Output Data
Rated Apparent Power 3KVA/2.4KW5KVA/5KW
Surge Capacity 2* rated powerfor 5 seconds
Standby / Self-Consumption Power <25W<50W
Saving Mode Power Consumption <10W<15W
PV String Input Data
Nominal DC Voltage 24Vdc48Vdc
Battery Data
High DC Recovery Voltage 29Vdc58Vdc
High DC Cut-off Voltage 31Vdc60Vdc
Additional Specifications
Floating Charging Voltage 27Vdc
Peak Efficiency 90%
Nominal Input Voltage 230Vac
Low Loss Return Voltage 180Vac± 7V (UPS); 100Vac± 7V (Appliances)
High Loss Voltage 280Vac± 7V
High Loss Return Voltage 270Vac± 7V
Max AC Input Voltage 300Vac
Nominal Input Frequency 50Hz / 60Hz (Auto detection)
Low Loss Frequency 40± 1Hz
Low Loss Return Frequency 42± 1Hz
High Loss Frequency 65± 1Hz
High Loss Return Frequency 63± 1Hz
Output Short Circuit Protection Line mode: Circuit Breaker Battery mode: Electronic Circuits
Efficiency (Line Mode) >95% ( Rated R load, battery full charged )
Transfer Time 10ms typical (For UPS) 20ms typical (For Appliances)

Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.

Availability & grid compliance in Sudan

Market Sudan
Grid authority / regulator Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum
Quotation currency SDG
Support hours timezone Africa/Khartoum
Delivery & installation coverage Khartoum, Omdurman, Port Sudan, Kassala, Nyala

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Sudan that is Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.