Voltronic Power ALFA-3/5KVA
The ALFA 3KVA is a solar inverter rated 3KVA. Every figure on this page is read from the manufacturer's manual for the ALFA series.
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | ALFA-3KVA | ALFA-5KVA |
|---|---|---|
| PV String Input Data | ||
| Nominal DC Voltage | 24Vdc | 48Vdc |
| Electrical / AC Output Data | ||
| Rated Apparent Power | 3KVA/2.4KW | 5KVA/5KW |
| Saving Mode Power Consumption | <10W | <15W |
| Standby / Self-Consumption Power | <25W | <50W |
| Surge Capacity | 2* rated power | for 5 seconds W |
| Battery Data | ||
| High DC Cut-off Voltage | 31Vdc | 60Vdc |
| High DC Recovery Voltage | 29Vdc | 58Vdc |
Note: Specifications are based on the official Voltronic Power ALFA-3/5KVA datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Netherlands
| Market | Netherlands |
| Grid authority / regulator | ACM Netherlands |
| Quotation currency | EUR |
| Support hours timezone | Europe/Amsterdam |
| Delivery & installation coverage | Amsterdam, Rotterdam, The Hague, Utrecht |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Netherlands that is ACM Netherlands. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.