Voltronic Power AXPERT-VM-III-TWIN-IP52-40A-AXPERT-VM-III-TWIN-IP52-4/6.5K
The Axpert VM III TWIN IP52 40A Axpert VM III TWIN IP52 4.5K is an off-grid solar inverter rated Axpert VM III TWIN IP52 4.5K.
Technical Specifications
| Parameter | AXPERT-VM-III-TWIN-IP52-40A-AXPERT-VM-III-TWIN-IP52-4.5K | AXPERT-VM-III-TWIN-IP52-40A-AXPERT-VM-III-TWIN-IP52-6.5K |
|---|---|---|
| Electrical / AC Output Data | ||
| Rated AC Power | 4500VA/4500W | |
| Selectable Voltage Range | 170-280 VAC (For Personal Computers) | |
| AC Voltage Regulation (Battery Mode) | 230VAC ± 5% | |
| Max Efficiency | 93% | |
| Surge / Peak Power | 9000VA | 13000VA |
| PV String Input Data | ||
| Max PV Array Power | 6000W | |
| Max PV Input Current | 40A | |
| Additional Specifications | ||
| Maximum Solar Charge Current | 120A | |
| Maximum Charge Current | 120A | |
| Transfer Time | 10 ms (For Personal 20 ms (For Home | |
| MPP Range @ Operating Voltage | 60 450 | |
| Floating Charge Voltage | 27 VDC | |
| Waveform | Pure sine wave | |
| Maximum PV Array Open Circuit Voltage | 500 VDC | |
| Solar Charger type | MPPT | |
| Battery Data | ||
| Max AC Charge Current | 100A | |
| Communication | ||
| Communication Interface | USB/RS232/RS485/WiFi/Dry-contact | |
| Protection Features | ||
| IP Rating | IP52 | |
| Operating Conditions | ||
| Relative Humidity | 5% to 95% | |
| Operating Temperature | -10°C to 50°C | |
| Storage Temperature Range | -15°C to 60°C | |
Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.
Availability & grid compliance in Yemen
| Market | Yemen |
| Grid authority / regulator | Public Electricity Corporation (PEC), Ministry of Electricity and Energy |
| Quotation currency | YER |
| Support hours timezone | Asia/Aden |
| Delivery & installation coverage | Sana'a, Aden, Taiz, Al Hudaydah, Mukalla |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Yemen that is Public Electricity Corporation (PEC), Ministry of Electricity and Energy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.