The Axpert MAX AIR 10K is an off-grid solar inverter rated Axpert MAX AIR 10K.
Technical Specifications
| Parameter | AXPERT-MAX-AIR-10K | AXPERT-MAX-AIR-12K | AXPERT-MAX-AIR-8K |
|---|---|---|---|
| Electrical / AC Output Data | |||
| AC Voltage Regulation (Battery Mode) | 230VAC ±10% | ||
| Max Efficiency | 93% | ||
| Rated AC Power | 10000VA/10000W | 12000VA/12000W | 8000VA/8000W |
| Selectable Voltage Range | 90-280 VAC (For Home Appliances) | — | 170-280 VAC (For Personal Computers) |
| Surge / Peak Power | 20000VA | 24000VA | 16000VA |
| Maximum Solar Charge Current | 150A | 200A | 150A |
| Communication | |||
| Communication Interface | USB/RS232/RS485/WiFi/Dry-contact | ||
| PV String Input Data | |||
| Max PV Array Power | 13000W | B000W | 11000W |
| Battery Data | |||
| Max AC Charge Current | 150A | 200A | 120A |
| Additional Specifications | |||
| Maximum PV Input Current | 30A x 2 (Max. 45A) | ||
| Waveform | Pure sine wave | ||
| Transfer Time | 10 ms (For Personal Computers) 20 ms (For Home Appliances) | ||
| Floating Charge Voltage | 54 VDC | ||
| Solar Charger type | MPPT | ||
| MPP Range @ Operating Voltage | 60 ~ 450 VDC | ||
| Maximum PV Array Open Circuit Voltage | 500 VDC | ||
| Ingress Protection | IP52 | ||
| Mechanical Data | |||
| Net Weight | 15.5 | ||
| Operating Conditions | |||
| Relative Humidity | 5% to 95% | ||
| Operating Temperature | -10°C to 50°C | ||
| Storage Temperature Range | -15°C to 60°C | ||
Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.
Availability & grid compliance in Yemen
| Market | Yemen |
| Grid authority / regulator | Public Electricity Corporation (PEC), Ministry of Electricity and Energy |
| Quotation currency | YER |
| Support hours timezone | Asia/Aden |
| Delivery & installation coverage | Sana'a, Aden, Taiz, Al Hudaydah, Mukalla |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Yemen that is Public Electricity Corporation (PEC), Ministry of Electricity and Energy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.