Voltronic Power Solutions

Voltronic Power AXPERT-MAX-AIR-10/12/8K

The Axpert MAX AIR 10K is an off-grid solar inverter rated Axpert MAX AIR 10K.

Models Covered: AXPERT-MAX-AIR-10K, AXPERT-MAX-AIR-12K, AXPERT-MAX-AIR-8K

Manufacturer: Voltronic Power

Application: The Axpert MAX AIR 10K is an off-grid solar inverter rated Axpert MAX AIR 10K. Every figure on this page is read from the manufacturer's manual for the Axpert MAX AIR series.

Technical Specifications

Technical Specifications
Parameter AXPERT-MAX-AIR-10KAXPERT-MAX-AIR-12KAXPERT-MAX-AIR-8K
Electrical / AC Output Data
AC Voltage Regulation (Battery Mode) 230VAC ±10%
Max Efficiency 93%
Rated AC Power 10000VA/10000W12000VA/12000W8000VA/8000W
Selectable Voltage Range 90-280 VAC (For Home Appliances)170-280 VAC (For Personal Computers)
Surge / Peak Power 20000VA24000VA16000VA
Maximum Solar Charge Current 150A200A150A
Communication
Communication Interface USB/RS232/RS485/WiFi/Dry-contact
PV String Input Data
Max PV Array Power 13000WB000W11000W
Battery Data
Max AC Charge Current 150A200A120A
Additional Specifications
Maximum PV Input Current 30A x 2 (Max. 45A)
Waveform Pure sine wave
Transfer Time 10 ms (For Personal Computers) 20 ms (For Home Appliances)
Floating Charge Voltage 54 VDC
Solar Charger type MPPT
MPP Range @ Operating Voltage 60 ~ 450 VDC
Maximum PV Array Open Circuit Voltage 500 VDC
Ingress Protection IP52
Mechanical Data
Net Weight 15.5
Operating Conditions
Relative Humidity 5% to 95%
Operating Temperature -10°C to 50°C
Storage Temperature Range -15°C to 60°C

Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.

Availability & grid compliance in Sudan

Market Sudan
Grid authority / regulator Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum
Quotation currency SDG
Support hours timezone Africa/Khartoum
Delivery & installation coverage Khartoum, Omdurman, Port Sudan, Kassala, Nyala

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Sudan that is Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.