Voltronic Power INFINISOLAR-WP-LV-PREMIUM-INFINISOLAR-WP-LV-12KW-PREMIUM
The InfiniSolar WP LV Premium InfiniSolar WP LV 12kw Premium is a hybrid solar inverter rated InfiniSolar WP LV 12kw Premium. Every figure on this page is read
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | INFINISOLAR-WP-LV-PREMIUM-INFINISOLAR-WP-LV-12KW-PREMIUM |
|---|---|
| PV String Input Data | |
| Max PV Input Power | 12000W |
| MPP Trackers / Strings per Tracker | 2/18A (MAX 30A) |
| Nominal DC Voltage | 40-62 VDC/48 VDC |
| Electrical / AC Output Data | |
| Rated Apparent Power | 10000VA/10000W |
| Max Conversion Efficiency (DC/AC) | 96% |
| Phase | 120V/240V Split phase, 120V/208V Split phase |
| Battery Data | |
| Max Charge Current | 200A |
| Max Charge Power | 10000W |
| Max Solar / PV Charge Current | 200A |
| Max AC Charge Current | 200A |
| Protection Features | |
| AFCI / Arc Fault Protection | Yes |
| DC Switch | Yes |
| Grid Connection Standards | IEEE 1547.1:2020; IEEE 1547:2018, California Rule 21, HECO Rule 14H EMC FCC Part 15 Class B |
| Ground Fault Monitoring | Yes |
| Lightning Protection | Yes |
| PV Rapid Shutdown | Yes |
| Safety / EMC Standards | UL1741SA, UL1741SB, CSA 22.2.107.1, CEC |
| Operating Conditions | |
| Operating Temperature | -25°C to 60°C (>45°C derating) |
Note: Specifications are based on the official Voltronic Power INFINISOLAR-WP-LV-PREMIUM-INFINISOLAR-WP-LV-12KW-PREMIUM datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Syria
| Market | Syria |
| Grid authority / regulator | Ministry of Electricity Syria |
| Quotation currency | SYP |
| Support hours timezone | Asia/Damascus |
| Delivery & installation coverage | Damascus, Aleppo, Homs |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Syria that is Ministry of Electricity Syria. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.