Voltronic Power INFINISOLAR-WP-LV-PREMIUM-INFINISOLAR-WP-LV-12KW-PREMIUM

The InfiniSolar WP LV Premium InfiniSolar WP LV 12kw Premium is a hybrid solar inverter rated InfiniSolar WP LV 12kw Premium. Every figure on this page is read

Models Covered: INFINISOLAR-WP-LV-PREMIUM-INFINISOLAR-WP-LV-12KW-PREMIUM

Manufacturer: Voltronic Power

Application: The InfiniSolar WP LV Premium InfiniSolar WP LV 12kw Premium is a hybrid solar inverter rated InfiniSolar WP LV 12kw Premium. Every figure on this page is read from the manufacturer's manual for the InfiniSolar WP LV Premium series.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter INFINISOLAR-WP-LV-PREMIUM-INFINISOLAR-WP-LV-12KW-PREMIUM
PV String Input Data
Max PV Input Power 12000W
MPP Trackers / Strings per Tracker 2/18A (MAX 30A)
Nominal DC Voltage 40-62 VDC/48 VDC
Electrical / AC Output Data
Rated Apparent Power 10000VA/10000W
Max Conversion Efficiency (DC/AC) 96%
Phase 120V/240V Split phase, 120V/208V Split phase
Battery Data
Max Charge Current 200A
Max Charge Power 10000W
Max Solar / PV Charge Current 200A
Max AC Charge Current 200A
Protection Features
AFCI / Arc Fault Protection Yes
DC Switch Yes
Grid Connection Standards IEEE 1547.1:2020; IEEE 1547:2018, California Rule 21, HECO Rule 14H EMC FCC Part 15 Class B
Ground Fault Monitoring Yes
Lightning Protection Yes
PV Rapid Shutdown Yes
Safety / EMC Standards UL1741SA, UL1741SB, CSA 22.2.107.1, CEC
Operating Conditions
Operating Temperature -25°C to 60°C (>45°C derating)

Note: Specifications are based on the official Voltronic Power INFINISOLAR-WP-LV-PREMIUM-INFINISOLAR-WP-LV-12KW-PREMIUM datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Germany

Market Germany
Grid authority / regulator Bundesnetzagentur
Quotation currency EUR
Support hours timezone Europe/Berlin
Delivery & installation coverage Berlin, Munich, Hamburg, Frankfurt

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Germany that is Bundesnetzagentur. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.