Voltronic Power Solutions

Voltronic Power INFINISOLARVII-1.5KW

The InfiniSolarVII 1.5KW is a solar inverter rated 1.5KW. Every figure on this page is read from the manufacturer's manual for the InfiniSolarVII series.

Models Covered: INFINISOLARVII-1.5KW

Manufacturer: Voltronic Power

Application: The InfiniSolarVII 1.5KW is a solar inverter rated 1.5KW. Every figure on this page is read from the manufacturer's manual for the InfiniSolarVII series.

Technical Specifications

Technical Specifications
Parameter INFINISOLARVII-1.5KW
Additional Specifications
Max. PV Power 2000W
Max. PV Array Open Circuit Voltage 400VDC
Power Factor Range >0.99
Efficiency (DC to AC) 93%
Maximum Charging Current (from Grid) 30A
Maximum Charging Current (from PV) 40A
Maximum Charging Current 40A
External Safety Box (Optional) Yes
MPPT Range @ Operating Voltage 120 VDC~380 VDC
Number of MPP Tracker 1
Parallel Function No
Communication Port USB or RS-232/Dry Contact
Electrical / AC Output Data
AC Output Voltage 220/230/240 VAC
Nominal Output Current 6.5A
Max Conversion Efficiency (DC/AC) 95%
Rating of AC Transfer Relay 30A
Feed-in Grid Voltage Range ~ 195.5~253 VAC @India regulation 184 264.5 VAC@Germany regulation 184~264.5VAC @South America regulation
Feed-in Grid Frequency Range 49~51Hz @India regulation 47.5 51.5Hz @Germany regulation 57~62Hz @South America regulation
Input Voltage Range 90 - 280 VAC or 170 - 280 VAC
AC Frequency Range 50 Hz/60 Hz (Auto sensing)
Communication
Communication Interface Dry-Contact or USB
PV String Input Data
Nominal DC Voltage 48 VDC
Mechanical Data
Dimensions (W×H×D) 100 x 300 x 440
Operating Conditions
Relative Humidity 0 ~ 90% RH (No condensing)
Operating Temperature 0 to 50°C

Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.

Availability & grid compliance in Sudan

Market Sudan
Grid authority / regulator Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum
Quotation currency SDG
Support hours timezone Africa/Khartoum
Delivery & installation coverage Khartoum, Omdurman, Port Sudan, Kassala, Nyala

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Sudan that is Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.