Voltronic Power Solutions

Voltronic Power AXPERT-MKS-ZERO-LV-1000-12/2000-24/3000-48

The Axpert MKS Zero LV Axpert MKS-ZERO LV 1000-12 is an off-grid solar inverter rated Axpert MKS-ZERO LV 1000-12.

Models Covered: AXPERT-MKS-ZERO-LV-1000-12, AXPERT-MKS-ZERO-LV-2000-24, AXPERT-MKS-ZERO-LV-3000-48

Manufacturer: Voltronic Power

Application: The Axpert MKS Zero LV Axpert MKS-ZERO LV 1000-12 is an off-grid solar inverter rated Axpert MKS-ZERO LV 1000-12. Every figure on this page is read from the manufacturer's manual for the Axpert MKS Zero LV series.

Technical Specifications

Technical Specifications
Parameter AXPERT-MKS-ZERO-LV-1000-12AXPERT-MKS-ZERO-LV-2000-24AXPERT-MKS-ZERO-LV-3000-48
PV String Input Data
MPPT Voltage Range 95-140 VAC
Max PV Open-Circuit Voltage 30~115V
Electrical / AC Output Data
THD / THDi ≤ 10%
AC Voltage Regulation (Battery Mode) 120VAC ± 5%
AC Frequency Range 46-54 Hz or 56-64 Hz
Transfer / Switchover Time Oms
Line Mode Efficiency > 90%
ECO Mode 98%
Rated AC Power 1000VA/1000W2000VA/2000W3000VA/3000W
Additional Specifications
Harmonic Distortion ≤3% THD (Linear Load); ≤ 5% THD (Non-linear Load)
MPPT Range @ Operating Voltage 15~115V
Floating Charge Voltage 13.5 VDC
Solar Charger Type MPPT
Maximum PV Array Power 4000 W
Battery Data
Max Solar / PV Charge Current 80A
Max AC Charge Current 60A
Communication
Communication Interface RS232
Operating Conditions
Relative Humidity 5% to 95%
Operating Temperature -10°C to 50°C

Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.

Availability & grid compliance in Sudan

Market Sudan
Grid authority / regulator Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum
Quotation currency SDG
Support hours timezone Africa/Khartoum
Delivery & installation coverage Khartoum, Omdurman, Port Sudan, Kassala, Nyala

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Sudan that is Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.