Voltronic Power AXPERT-MKS-ZERO-LV-1000-12/2000-24/3000-48
The Axpert MKS Zero LV Axpert MKS-ZERO LV 1000-12 is a off-grid solar inverter rated Axpert MKS-ZERO LV 1000-12. Every figure on this page is read from the manu
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-MKS-ZERO-LV-1000-12 | AXPERT-MKS-ZERO-LV-2000-24 | AXPERT-MKS-ZERO-LV-3000-48 |
|---|---|---|---|
| PV String Input Data | |||
| MPPT Voltage Range | 15~115V | ||
| Max PV Open-Circuit Voltage | 30~115V | ||
| Electrical / AC Output Data | |||
| Rated AC Power | 1000VA/1000W | 2000VA/2000W | 3000VA/3000W |
| Transfer / Switchover Time | Oms | ||
| AC Frequency Range | 46-54 Hz or 56-64 Hz | ||
| Input Voltage Range | 95-140 VAC | ||
| Line Mode Efficiency | > 90% | ||
| THD / THDi | ≤ 10% | ||
| AC Voltage Regulation (Battery Mode) | 120VAC ± 5% | ||
| ECO Mode | 98% | ||
| Battery Data | |||
| Max Solar / PV Charge Current | 80A | ||
| Max AC Charge Current | 60A | ||
| Mechanical Data | |||
| Dimensions (W×H×D) | 295 x 468 x 120 mm | ||
| Weight | 10.5 kg | 11.0 kg | 11.5 kg |
| Operating Conditions | |||
| Operating Temperature | -10°C to 50°C | ||
| Relative Humidity | 5% to 95% | ||
| Communication | |||
| Communication Interface | RS232 | ||
Note: Specifications are based on the official Voltronic Power AXPERT-MKS-ZERO-LV-1000-12/2000-24/3000-48 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Bahrain
| Market | Bahrain |
| Grid authority / regulator | EWA Bahrain |
| Quotation currency | BHD |
| Support hours timezone | Asia/Bahrain |
| Delivery & installation coverage | Manama, Riffa, Muharraq |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Bahrain that is EWA Bahrain. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.