Voltronic Power AXPERT-MKS-TWIN-AXPERT-MKS-4-TWIN-6K
The Axpert MKS TWIN Axpert MKS 4 TWIN 6K is a off-grid solar inverter rated Axpert MKS 4 TWIN 6K. Every figure on this page is read from the manufacturer's manu
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-MKS-TWIN-AXPERT-MKS-4-TWIN-6K |
|---|---|
| PV String Input Data | |
| Max PV Input Current | 27A |
| Electrical / AC Output Data | |
| Rated AC Power | 6000VA/6000W |
| Selectable Voltage Range | 170-280 VAC (For Personal Computers) |
| Mechanical Data | |
| Net Weight | 12.0 kg |
| Operating Conditions | |
| Operating Temperature | -10°C to 50°C |
| Relative Humidity | 5% to 95% |
| Storage Temperature Range | -15˚°C to 60°C Advancing Power |
| Communication | |
| Communication Interface | USB/RS232/RS485/Wifi/Dry-contact |
Note: Specifications are based on the official Voltronic Power AXPERT-MKS-TWIN-AXPERT-MKS-4-TWIN-6K datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Saudi Arabia
| Market | Saudi Arabia |
| Grid authority / regulator | SEC, ECRA, SASO |
| Quotation currency | SAR |
| Support hours timezone | Asia/Riyadh |
| Delivery & installation coverage | Riyadh, Jeddah, Dammam, Mecca, Medina |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Saudi Arabia that is SEC, ECRA, SASO. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.