Voltronic Power AXPERT-MKS-TWIN-AXPERT-MKS-4-TWIN-6K

The Axpert MKS TWIN Axpert MKS 4 TWIN 6K is a off-grid solar inverter rated Axpert MKS 4 TWIN 6K. Every figure on this page is read from the manufacturer's manu

Models Covered: AXPERT-MKS-TWIN-AXPERT-MKS-4-TWIN-6K

Manufacturer: Voltronic Power

Application: The Axpert MKS TWIN Axpert MKS 4 TWIN 6K is a off-grid solar inverter rated Axpert MKS 4 TWIN 6K. Every figure on this page is read from the manufacturer's manual for the Axpert MKS TWIN series.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter AXPERT-MKS-TWIN-AXPERT-MKS-4-TWIN-6K
PV String Input Data
Max PV Input Current 27A
Electrical / AC Output Data
Rated AC Power 6000VA/6000W
Selectable Voltage Range 170-280 VAC (For Personal Computers)
Mechanical Data
Net Weight 12.0 kg
Operating Conditions
Operating Temperature -10°C to 50°C
Relative Humidity 5% to 95%
Storage Temperature Range -15˚°C to 60°C Advancing Power
Communication
Communication Interface USB/RS232/RS485/Wifi/Dry-contact

Note: Specifications are based on the official Voltronic Power AXPERT-MKS-TWIN-AXPERT-MKS-4-TWIN-6K datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Italy

Market Italy
Grid authority / regulator ARERA Italy
Quotation currency EUR
Support hours timezone Europe/Rome
Delivery & installation coverage Rome, Milan, Naples, Turin

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Italy that is ARERA Italy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.