Voltronic Power SCC-PWM-120W / SCC-PWM-240W / SCC-PWM-360W / SCC-PWM-600W / SCC-PWM-720W
The SCC PWM SCC-PWM-120W is a solar charge controller rated SCC-PWM-120W. Every figure on this page is read from the manufacturer's manual for the SCC PWM serie
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | SCC-PWM-120W | SCC-PWM-240W | SCC-PWM-360W | SCC-PWM-600W | SCC-PWM-720W |
|---|---|---|---|---|---|
| Battery Data | |||||
| Supported Battery Type | Sealed lead acid battery | ||||
| Protection Features | |||||
| IP Rating | IP 31 | ||||
| Mechanical Data | |||||
| Dimensions (W×H×D) | 60.7 x 30.8 x 92.6 mm | 60.7 x 30.8 x 92.6 mm | 75 x 30.8 x 107.6 mm | 85 x 40.5 x 131 mm | 75 x 30.8 x 107.6 mm |
| Weight | 0.21 kg | 0.21 kg | 0.34 kg | 0.49 kg | 0.34 kg |
| Operating Conditions | |||||
| Operating Temperature | -20°C to 55°C | ||||
| Storage Temperature Range | -40°C to 75°C | ||||
| Communication | |||||
| Display | Green LED indicating charging status | ||||
Note: Specifications are based on the official Voltronic Power SCC-PWM-120W / SCC-PWM-240W / SCC-PWM-360W / SCC-PWM-600W / SCC-PWM-720W datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Qatar
| Market | Qatar |
| Grid authority / regulator | Kahramaa |
| Quotation currency | QAR |
| Support hours timezone | Asia/Qatar |
| Delivery & installation coverage | Doha, Al Wakrah, Al Khor |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Qatar that is Kahramaa. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.