Voltronic Power AXPERT-MAX-II-80000
The Axpert MAX II Axpert MAX II 80000 is a off-grid solar inverter rated Axpert MAX II 80000. Every figure on this page is read from the manufacturer's manual f
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-MAX-II-80000 |
|---|---|
| PV String Input Data | |
| Max PV Array Power | 8000W (4000W x 2) |
| Nominal DC Voltage | 12 VDC ± 5%, 100W |
| Solar Charger Type | MPPT |
| Electrical / AC Output Data | |
| Surge / Peak Power | 16000VA |
| Transfer / Switchover Time | 15 ms (For Personal Computers); 20 ms (For Home Appliances) |
| Output Waveform | Pure sine wave |
| AC Voltage Regulation (Battery Mode) | 230VAC ± 5% |
| Selectable Voltage Range | 170-280 VAC (For Personal Computers); 90-280 VAC (For Home Appliances) |
| Standby / Self-Consumption Power | < 70W |
| Battery Data | |
| Max Charge Current | 150A |
| Max Solar / PV Charge Current | 150A |
| Floating / Constant Charge Voltage | 54 VDC |
| Max AC Charge Current | 120A |
| Mechanical Data | |
| Dimensions (W×H×D) | 158.4 x 502.5 x 1530.8 mm |
| Net Weight | 20 kg |
| Operating Conditions | |
| Operating Temperature | -10°C to 50°C |
| Relative Humidity | 5% to 95% Relative Humidity (Non-condensing) |
| Storage Temperature Range | -15°C to 60°C |
Note: Specifications are based on the official Voltronic Power AXPERT-MAX-II-80000 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Qatar
| Market | Qatar |
| Grid authority / regulator | Kahramaa |
| Quotation currency | QAR |
| Support hours timezone | Asia/Qatar |
| Delivery & installation coverage | Doha, Al Wakrah, Al Khor |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Qatar that is Kahramaa. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.