Voltronic Power JAGUARM-SOLAR-INVERTER-JUGUAR-M-1.2/2.4K

The JaguarM Solar Inverter Juguar-M 1.2K is a off-grid solar inverter rated Juguar-M 1.2K. Every figure on this page is read from the manufacturer's manual for

Models Covered: JAGUARM-SOLAR-INVERTER-JUGUAR-M-1.2K, JAGUARM-SOLAR-INVERTER-JUGUAR-M-2.4K

Manufacturer: Voltronic Power

Application: The JaguarM Solar Inverter Juguar-M 1.2K is a off-grid solar inverter rated Juguar-M 1.2K. Every figure on this page is read from the manufacturer's manual for the JaguarM Solar Inverter series.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter JAGUARM-SOLAR-INVERTER-JUGUAR-M-1.2KJAGUARM-SOLAR-INVERTER-JUGUAR-M-2.4K
PV String Input Data
Max PV Array Power 600 W1200 W
MPPT Voltage Range 30-80 VDC
Max PV Open-Circuit Voltage 100 VDC
Solar Charger Type MPPT
Electrical / AC Output Data
Output Waveform Simulated SineWave
Overload Capability Load >110%±15%, alarm 5 minutes If decreasing the load until lower than 100% Load >130% ±15%, inverter
AC Voltage Regulation (Battery Mode) 220-240 VAC±10%
Selectable Voltage Range 90-280 VAC
Battery Data
Max Charge Current 50A
Max Solar / PV Charge Current 50A
Floating / Constant Charge Voltage 13.7 VDC ± 0.5 VDC27.4 VDC ± 1 VDC
Max AC Charge Current 10A/20A
Mechanical Data
Dimensions (W×H×D) 272 x 212 x mm127 mm
Net Weight 4.5 kg4.8 kg
Operating Conditions
Operating Temperature 0°C to 55°
Storage Temperature Range -15°C to 55

Note: Specifications are based on the official Voltronic Power JAGUARM-SOLAR-INVERTER-JUGUAR-M-1.2/2.4K datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Oman

Market Oman
Grid authority / regulator Authority for Electricity Regulation Oman
Quotation currency OMR
Support hours timezone Asia/Muscat
Delivery & installation coverage Muscat, Salalah, Sohar

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Oman that is Authority for Electricity Regulation Oman. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.