Voltronic Power JAGUARM-SOLAR-INVERTER-JUGUAR-M-1.2/2.4K
The JaguarM Solar Inverter Juguar-M 1.2K is a off-grid solar inverter rated Juguar-M 1.2K. Every figure on this page is read from the manufacturer's manual for
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | JAGUARM-SOLAR-INVERTER-JUGUAR-M-1.2K | JAGUARM-SOLAR-INVERTER-JUGUAR-M-2.4K |
|---|---|---|
| PV String Input Data | ||
| Max PV Array Power | 600 W | 1200 W |
| MPPT Voltage Range | 30-80 VDC | |
| Max PV Open-Circuit Voltage | 100 VDC | |
| Solar Charger Type | MPPT | |
| Electrical / AC Output Data | ||
| Output Waveform | Simulated Sine | Wave |
| Overload Capability | Load >110%±15%, alarm 5 minutes If decreasing the load until lower than 100% Load >130% ±15%, inverter | — |
| AC Voltage Regulation (Battery Mode) | 220-240 VAC | ±10% |
| Selectable Voltage Range | 90-280 VAC | |
| Battery Data | ||
| Max Charge Current | 50A | |
| Max Solar / PV Charge Current | 50A | |
| Floating / Constant Charge Voltage | 13.7 VDC ± 0.5 VDC | 27.4 VDC ± 1 VDC |
| Max AC Charge Current | 10A/20A | |
| Mechanical Data | ||
| Dimensions (W×H×D) | 272 x 212 x mm | 127 mm |
| Net Weight | 4.5 kg | 4.8 kg |
| Operating Conditions | ||
| Operating Temperature | 0°C to 55° | — |
| Storage Temperature Range | -15°C to 55 | — |
Note: Specifications are based on the official Voltronic Power JAGUARM-SOLAR-INVERTER-JUGUAR-M-1.2/2.4K datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Germany
| Market | Germany |
| Grid authority / regulator | Bundesnetzagentur |
| Quotation currency | EUR |
| Support hours timezone | Europe/Berlin |
| Delivery & installation coverage | Berlin, Munich, Hamburg, Frankfurt |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Germany that is Bundesnetzagentur. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.