Voltronic Power AXPERT-MKS-II-5KVA

The Axpert MKS II 5KVA is a solar inverter rated 5KVA. Every figure on this page is read from the manufacturer's manual for the Axpert MKS II series.

Models Covered: AXPERT-MKS-II-5KVA

Manufacturer: Voltronic Power

Application: The Axpert MKS II 5KVA is a solar inverter rated 5KVA. Every figure on this page is read from the manufacturer's manual for the Axpert MKS II series.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter AXPERT-MKS-II-5KVA
Electrical / AC Output Data
Transfer / Switchover Time 10ms typical (UPS); 20ms typical (Appliances)
AC Input Voltage 230Vac
Grid / AC Frequency 50Hz/60Hz (Auto detection)
Line Mode Efficiency >95% (Rated R load, battery full charged )
High Line Disconnect 280Vac±7V
High Line Re-connect 270Vac±7V
Low Line Disconnect 170Vac±7V (UPS) 90Vac±7V (Appliances)
Low Line Re-connect 180Vac±7V (UPS); 100Vac±7V (Appliances)
Max AC Input Voltage 300Vac
High Line Frequency Disconnect 65±1Hz
High Line Frequency Re-connect 63±1Hz
Low Line Frequency Disconnect 40±1Hz
Low Line Frequency Re-connect 42±1Hz
Mechanical Data
Weight 11.0 kg

Note: Specifications are based on the official Voltronic Power AXPERT-MKS-II-5KVA datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Jordan

Market Jordan
Grid authority / regulator EMRC Jordan
Quotation currency JOD
Support hours timezone Asia/Amman
Delivery & installation coverage Amman, Zarqa, Irbid

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Jordan that is EMRC Jordan. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.