Voltronic Power AXPERT-MKS-II-5KVA
The Axpert MKS II 5KVA is a solar inverter rated 5KVA. Every figure on this page is read from the manufacturer's manual for the Axpert MKS II series.
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-MKS-II-5KVA |
|---|---|
| Electrical / AC Output Data | |
| Transfer / Switchover Time | 10ms typical (UPS); 20ms typical (Appliances) |
| AC Input Voltage | 230Vac |
| Grid / AC Frequency | 50Hz/60Hz (Auto detection) |
| Line Mode Efficiency | >95% (Rated R load, battery full charged ) |
| High Line Disconnect | 280Vac±7V |
| High Line Re-connect | 270Vac±7V |
| Low Line Disconnect | 170Vac±7V (UPS) 90Vac±7V (Appliances) |
| Low Line Re-connect | 180Vac±7V (UPS); 100Vac±7V (Appliances) |
| Max AC Input Voltage | 300Vac |
| High Line Frequency Disconnect | 65±1Hz |
| High Line Frequency Re-connect | 63±1Hz |
| Low Line Frequency Disconnect | 40±1Hz |
| Low Line Frequency Re-connect | 42±1Hz |
| Mechanical Data | |
| Weight | 11.0 kg |
Note: Specifications are based on the official Voltronic Power AXPERT-MKS-II-5KVA datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Egypt
| Market | Egypt |
| Grid authority / regulator | EgyptERA, NREA |
| Quotation currency | EGP |
| Support hours timezone | Africa/Cairo |
| Delivery & installation coverage | Cairo, Alexandria, Giza, Aswan |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Egypt that is EgyptERA, NREA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.