Voltronic Power AXPERT-MKS-III-TWIN-6K
The Axpert MKS III TWIN Axpert MKS III TWIN 6K is a off-grid solar inverter rated Axpert MKS III TWIN 6K. Every figure on this page is read from the manufacture
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-MKS-III-TWIN-6K |
|---|---|
| PV String Input Data | |
| Max PV Array Power | 6000W |
| Max PV Input Current | 27A |
| Electrical / AC Output Data | |
| Max Efficiency | 90% |
| Rated AC Power | 6000VA/6000W |
| Selectable Voltage Range | 170-280 VAC (For Personal Computers) |
| Mechanical Data | |
| Dimensions (W×H×D) | 295 x 468 x 140 mm |
| Net Weight | 12.0 kg |
| Operating Conditions | |
| Operating Temperature | -10°C to 50°C |
| Relative Humidity | 5% to 95% |
| Storage Temperature Range | -15°C to 60°C |
| Communication | |
| Communication Interface | USB, RS232, RS485, WiFi |
Note: Specifications are based on the official Voltronic Power AXPERT-MKS-III-TWIN-6K datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Italy
| Market | Italy |
| Grid authority / regulator | ARERA Italy |
| Quotation currency | EUR |
| Support hours timezone | Europe/Rome |
| Delivery & installation coverage | Rome, Milan, Naples, Turin |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Italy that is ARERA Italy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.