Voltronic Power AXPERT-MKS-III-TWIN-6K

The Axpert MKS III TWIN Axpert MKS III TWIN 6K is a off-grid solar inverter rated Axpert MKS III TWIN 6K. Every figure on this page is read from the manufacture

Models Covered: AXPERT-MKS-III-TWIN-6K

Manufacturer: Voltronic Power

Application: The Axpert MKS III TWIN Axpert MKS III TWIN 6K is a off-grid solar inverter rated Axpert MKS III TWIN 6K. Every figure on this page is read from the manufacturer's manual for the Axpert MKS III TWIN series.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter AXPERT-MKS-III-TWIN-6K
PV String Input Data
Max PV Array Power 6000W
Max PV Input Current 27A
Electrical / AC Output Data
Max Efficiency 90%
Rated AC Power 6000VA/6000W
Selectable Voltage Range 170-280 VAC (For Personal Computers)
Mechanical Data
Dimensions (W×H×D) 295 x 468 x 140 mm
Net Weight 12.0 kg
Operating Conditions
Operating Temperature -10°C to 50°C
Relative Humidity 5% to 95%
Storage Temperature Range -15°C to 60°C
Communication
Communication Interface USB, RS232, RS485, WiFi

Note: Specifications are based on the official Voltronic Power AXPERT-MKS-III-TWIN-6K datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Germany

Market Germany
Grid authority / regulator Bundesnetzagentur
Quotation currency EUR
Support hours timezone Europe/Berlin
Delivery & installation coverage Berlin, Munich, Hamburg, Frankfurt

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Germany that is Bundesnetzagentur. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.