Voltronic Power AXPERT-MAX-II-6500

The Axpert MAX II Axpert MAX II 6500 is a off-grid solar inverter rated Axpert MAX II 6500. Every figure on this page is read from the manufacturer's manual for

Models Covered: AXPERT-MAX-II-6500

Manufacturer: Voltronic Power

Application: The Axpert MAX II Axpert MAX II 6500 is a off-grid solar inverter rated Axpert MAX II 6500. Every figure on this page is read from the manufacturer's manual for the Axpert MAX II series.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter AXPERT-MAX-II-6500
PV String Input Data
Max PV Array Power 8000W (4000W x 2)
Electrical / AC Output Data
Max Efficiency 91%
Rated AC Power 6500VA/6500W
Surge / Peak Power 13000VA
Parallel Capability YES, 6 units
AC Voltage Regulation (Battery Mode) 120VAC ± 5%
Selectable Voltage Range 90-140 VAC (For Computers); 80-140 VAC (For Home Appliances)
Standby / Self-Consumption Power < 75W
Battery Data
Max Charge Current 120A
Max Solar / PV Charge Current 120A
Max AC Charge Current 120A
Mechanical Data
Dimensions (W×H×D) 503.6 x 530.8 x 158.4 mm
Weight 20.0 kg
Operating Conditions
Operating Temperature -10°C to 50°C
Relative Humidity 5% to 95%
Storage Temperature Range -15°C to 60°C
Communication
Communication Interface USB/RS232/RS485/WiFi/Dry-contact

Note: Specifications are based on the official Voltronic Power AXPERT-MAX-II-6500 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Italy

Market Italy
Grid authority / regulator ARERA Italy
Quotation currency EUR
Support hours timezone Europe/Rome
Delivery & installation coverage Rome, Milan, Naples, Turin

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Italy that is ARERA Italy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.