Voltronic Power AXPERT-V-PF1-1/2/3KVA
The Axpert V PF1 1KVA is a solar inverter rated 1KVA. Every figure on this page is read from the manufacturer's manual for the Axpert V PF1 series.
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-V-PF1-1KVA | AXPERT-V-PF1-2KVA | AXPERT-V-PF1-3KVA |
|---|---|---|---|
| General Data | |||
| Outlets / Output Connectors | — | 500M | — |
| Electrical / AC Output Data | |||
| Transfer / Switchover Time | 10ms typical (UPS); | ||
| Grid / AC Frequency | 50Hz/60Hz (Auto detection) | ||
| Line Mode Efficiency | >95% (Rated R load | ||
| Nominal Voltage | > 2.167 V/cell | — | Load Percentage V |
| Output Waveform | Sinusoidal (utility or generator) | ||
| High Line Disconnect | 280Vac±7V | ||
| High Line Re-connect | 270Vac±7V | ||
| Low Line Disconnect | 90Vac±7V (Appliances) | ||
| Max AC Input Voltage | 300Vac | ||
| High Line Frequency Disconnect | 65±1Hz | ||
| High Line Frequency Re-connect | 63±1Hz | ||
| Low Line Frequency Disconnect | 40±1Hz | ||
| Low Line Frequency Re-connect | 42±1Hz | ||
| Battery Data | |||
| Floating / Constant Charge Voltage | 13.5Vdc | 27Vdc | 54Vdc |
| Protection Features | |||
| Output Short-Circuit Protection | Circuit Breaker | ||
| Operating Conditions | |||
| Operating Temperature | -10°C to 50°C | ||
| Storage Temperature Range | -15°C~ 60°C | ||
| Communication | |||
| Display | <2V/cell | Current mode / | 2.083~2.167V/cell |
Note: Specifications are based on the official Voltronic Power AXPERT-V-PF1-1/2/3KVA datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Iraq
| Market | Iraq |
| Grid authority / regulator | Ministry of Electricity Iraq |
| Quotation currency | IQD |
| Support hours timezone | Asia/Baghdad |
| Delivery & installation coverage | Baghdad, Basra, Erbil, Mosul |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Iraq that is Ministry of Electricity Iraq. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.