Voltronic Power AXPERT-MAX-E-TWIN-11000
The Axpert MAX E TWIN Axpert MAX E TWIN-11000 is a off-grid solar inverter rated Axpert MAX E TWIN-11000. Every figure on this page is read from the manufacture
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-MAX-E-TWIN-11000 |
|---|---|
| PV String Input Data | |
| Max PV Array Power | 11000W |
| MPPT Voltage Range | 90~450 VDC |
| Electrical / AC Output Data | |
| Max Efficiency | 93% |
| Rated AC Power | 11000VA/11000W |
| Surge / Peak Power | 22000VA |
| Parallel Capability | YES, 6 units |
| AC Voltage Regulation (Battery Mode) | 230VAC ±5% |
| Selectable Voltage Range | 170-280 VAC (For Computers) |
| Standby / Self-Consumption Power | <70W |
| Battery Data | |
| Max Charge Current | 150A |
| Max Solar / PV Charge Current | 150A |
| Max AC Charge Current | 150A |
| Mechanical Data | |
| Dimensions (W×H×D) | 432.5 x 553.6 x 147.4 mm |
| Net Weight | 18.4 kg |
| Operating Conditions | |
| Operating Temperature | -10°C to 50°C |
| Relative Humidity | 5% to 95% |
| Storage Temperature Range | -15°C to 60°C |
| Communication | |
| Communication Interface | USB/RS232/RS485/WiFi/Dry-contact |
Note: Specifications are based on the official Voltronic Power AXPERT-MAX-E-TWIN-11000 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Spain
| Market | Spain |
| Grid authority / regulator | CNMC Spain |
| Quotation currency | EUR |
| Support hours timezone | Europe/Madrid |
| Delivery & installation coverage | Madrid, Barcelona, Valencia, Seville |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Spain that is CNMC Spain. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.