The InfiniSolar WP 3PH InfiniSolar WP 10KW is an on-grid solar inverter rated InfiniSolar WP 10KW.
Technical Specifications
| Parameter | INFINISOLAR-WP-3PH-INFINISOLAR-WP-10KW |
|---|---|
| Electrical / AC Output Data | |
| Max Efficiency | >96% |
| Max Conversion Efficiency (DC/AC) | 91% |
| Communication | |
| Communication Interface | RS-232, RS-485, USB, CAN and Wi-Fi |
| Additional Specifications | |
| Nominal DC Voltage / Maximum DC Voltage | 720 VDC/1000 VDC |
| Start-up Voltage / Initial Feeding Voltage | 320 VDC/350 VDC |
| Nominal Output Voltage | 230 VAC (P-N)/ 400 VAC (P-P) |
| MPP Voltage Range | 350 ~ 950 VDC |
| Number of MPP Trackers / Maximum Input Current | 2 / A: 27A, B: 27A |
| Nominal Output Current | 14.5 A per phase |
| Maximum AC Input Current | 40 A |
| Maximum Charging Current | 200 A |
| European Efficiency@ Vnominal | >95% |
| Intelligent Slot | Optional for SNMP and Modbus cards |
| AC Start-up Voltage / Auto Restart Voltage | 120 - 140 VAC / 180 VAC |
| Net Weight (kgs) | 70 |
| Dimension, D x W x H (mm) | 255 x 660 x 750 |
| Humidity | 0 100% RH (Non-condensing) |
| Operating Conditions | |
| Operating Temperature | -25 to 60°C, > 45°C power derating |
| Max Altitude | 0~1000 m** |
Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.
Availability & grid compliance in Yemen
| Market | Yemen |
| Grid authority / regulator | Public Electricity Corporation (PEC), Ministry of Electricity and Energy |
| Quotation currency | YER |
| Support hours timezone | Asia/Aden |
| Delivery & installation coverage | Sana'a, Aden, Taiz, Al Hudaydah, Mukalla |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Yemen that is Public Electricity Corporation (PEC), Ministry of Electricity and Energy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.