The InfiniSolar WP 3PH InfiniSolar WP 10KW is an on-grid solar inverter rated InfiniSolar WP 10KW.
Technical Specifications
| Parameter | INFINISOLAR-WP-3PH-INFINISOLAR-WP-10KW |
|---|---|
| Electrical / AC Output Data | |
| Max Efficiency | >96% |
| Max Conversion Efficiency (DC/AC) | 91% |
| Communication | |
| Communication Interface | RS-232, RS-485, USB, CAN and Wi-Fi |
| Additional Specifications | |
| Nominal DC Voltage / Maximum DC Voltage | 720 VDC/1000 VDC |
| Start-up Voltage / Initial Feeding Voltage | 320 VDC/350 VDC |
| Nominal Output Voltage | 230 VAC (P-N)/ 400 VAC (P-P) |
| MPP Voltage Range | 350 ~ 950 VDC |
| Number of MPP Trackers / Maximum Input Current | 2 / A: 27A, B: 27A |
| Nominal Output Current | 14.5 A per phase |
| Maximum AC Input Current | 40 A |
| Maximum Charging Current | 200 A |
| European Efficiency@ Vnominal | >95% |
| Intelligent Slot | Optional for SNMP and Modbus cards |
| AC Start-up Voltage / Auto Restart Voltage | 120 - 140 VAC / 180 VAC |
| Net Weight (kgs) | 70 |
| Dimension, D x W x H (mm) | 255 x 660 x 750 |
| Humidity | 0 100% RH (Non-condensing) |
| Operating Conditions | |
| Operating Temperature | -25 to 60°C, > 45°C power derating |
| Max Altitude | 0~1000 m** |
Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.
Availability & grid compliance in Sudan
| Market | Sudan |
| Grid authority / regulator | Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum |
| Quotation currency | SDG |
| Support hours timezone | Africa/Khartoum |
| Delivery & installation coverage | Khartoum, Omdurman, Port Sudan, Kassala, Nyala |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Sudan that is Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.