Voltronic Power INFINISOLAR-2KW
The InfiniSolar InfiniSolar 2KW is an on-grid solar inverter rated InfiniSolar 2KW.
Technical Specifications
| Parameter | INFINISOLAR-2KW |
|---|---|
| Electrical / AC Output Data | |
| Phase | 1-phase in /1-phase out |
| AC Output Voltage | 101/110/120/127 VAC |
| Output Voltage Range | 88-127 VAC* |
| Nominal Output Current | 21.7A per phase |
| Power Factor | > 0.99 |
| Max Conversion Efficiency (DC/AC) | 95% 96% |
| European Efficiency | 94% |
| Input Voltage Range | 80-130 VAC 170-280 VAC 170-280 VAC per phase 170-280 VAC per phase |
| Battery Data | |
| Max Charge Power | 2880W |
| Additional Specifications | |
| Efficiency (DC to AC) | 90% 93% 91% 91% |
| Nominal DC Voltage / Maximum DC Voltage | 300 VDC / 350 VDC |
| Start-up Voltage / Initial Feeding Voltage | 80 VDC / 120 VDC |
| MPP Voltage Range | 150 VDC ~ 320 VDC |
| Maximum AC Input Current | 30 A |
| Nominal DC Voltage | 48 VDC |
| Intelligent Slot | Optional SNMP, Modbus and AS-400 cards available |
| Humidity | 0 ~ 90% RH (Non-Condensing) |
| PV String Input Data | |
| Start-up Voltage | 60-70 VAC/85 VAC / 180 VAC per phase / 180 VAC per phase |
| Communication | |
| Communication Interface | RS-232/USB RS-232/USB RS-232, USB and |
| Mechanical Data | |
| Net Weight | 15.5 |
| Operating Conditions | |
| Operating Temperature | -10 to 55°C |
| Max Altitude | VDE-AR-N 4105 VDE 0126-1-1 AS4777, AS/NZS3100, NRS-097-2-1 (only for InfiniSolar Plus 3KW) |
Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.
Availability & grid compliance in Yemen
| Market | Yemen |
| Grid authority / regulator | Public Electricity Corporation (PEC), Ministry of Electricity and Energy |
| Quotation currency | YER |
| Support hours timezone | Asia/Aden |
| Delivery & installation coverage | Sana'a, Aden, Taiz, Al Hudaydah, Mukalla |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Yemen that is Public Electricity Corporation (PEC), Ministry of Electricity and Energy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.