Voltronic Power Solutions

Voltronic Power INFINISOLAR-2KW

The InfiniSolar InfiniSolar 2KW is an on-grid solar inverter rated InfiniSolar 2KW.

Models Covered: INFINISOLAR-2KW

Manufacturer: Voltronic Power

Application: The InfiniSolar InfiniSolar 2KW is an on-grid solar inverter rated InfiniSolar 2KW. Every figure on this page is read from the manufacturer's manual for the InfiniSolar series.

Technical Specifications

Technical Specifications
Parameter INFINISOLAR-2KW
Electrical / AC Output Data
Phase 1-phase in /1-phase out
AC Output Voltage 101/110/120/127 VAC
Output Voltage Range 88-127 VAC*
Nominal Output Current 21.7A per phase
Power Factor > 0.99
Max Conversion Efficiency (DC/AC) 95% 96%
European Efficiency 94%
Input Voltage Range 80-130 VAC 170-280 VAC 170-280 VAC per phase 170-280 VAC per phase
Battery Data
Max Charge Power 2880W
Additional Specifications
Efficiency (DC to AC) 90% 93% 91% 91%
Nominal DC Voltage / Maximum DC Voltage 300 VDC / 350 VDC
Start-up Voltage / Initial Feeding Voltage 80 VDC / 120 VDC
MPP Voltage Range 150 VDC ~ 320 VDC
Maximum AC Input Current 30 A
Nominal DC Voltage 48 VDC
Intelligent Slot Optional SNMP, Modbus and AS-400 cards available
Humidity 0 ~ 90% RH (Non-Condensing)
PV String Input Data
Start-up Voltage 60-70 VAC/85 VAC / 180 VAC per phase / 180 VAC per phase
Communication
Communication Interface RS-232/USB RS-232/USB RS-232, USB and
Mechanical Data
Net Weight 15.5
Operating Conditions
Operating Temperature -10 to 55°C
Max Altitude VDE-AR-N 4105 VDE 0126-1-1 AS4777, AS/NZS3100, NRS-097-2-1 (only for InfiniSolar Plus 3KW)

Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.

Availability & grid compliance in Sudan

Market Sudan
Grid authority / regulator Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum
Quotation currency SDG
Support hours timezone Africa/Khartoum
Delivery & installation coverage Khartoum, Omdurman, Port Sudan, Kassala, Nyala

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Sudan that is Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.