Voltronic Power AXPERT-MKS-TWIN-LV-AXPERT-MKS-5-TWIN-LV-3.6K
The Axpert MKS TWIN LV Axpert MKS 5 TWIN LV 3.6K is an off-grid solar inverter rated Axpert MKS 5 TWIN LV 3.6K.
Technical Specifications
| Parameter | AXPERT-MKS-TWIN-LV-AXPERT-MKS-5-TWIN-LV-3.6K |
|---|---|
| Electrical / AC Output Data | |
| Selectable Voltage Range | 95-140 VAC (For Personal Computers) 65-140 VAC (For Home Appliances) |
| AC Voltage Regulation (Battery Mode) | 120VAC ±5% |
| Output Waveform | Pure sine wave |
| Overload Capability | 5s@≥150% load; 10s@110%~150% load; 100ms @ ≥200% load |
| Transfer / Switchover Time | 10 ms (For Personal Computers) ; 20 ms (For Home Appliances) |
| PV String Input Data | |
| Max PV Array Power | 7200W |
| Max PV Input Current | 27A |
| Solar Charger Type | MPPT |
| Max PV Open-Circuit Voltage | 500 VDC |
| Battery Data | |
| Max AC Charge Current | 70A |
| Floating / Constant Charge Voltage | 54 VDC |
| Additional Specifications | |
| Maxmum Solar Charge Current | 120 A |
| Maximum Charge Current | 120 A |
| Efficiency (Peak) | 93 % |
| Mechanical Data | |
| Net Weight | 12.0 |
| Dimensions (W×H×D) | 140 x 295 x 468 |
| Operating Conditions | |
| Relative Humidity | 5% to 95% Relative Humidity(Non-condensing) |
| Operating Temperature | -10°C to 50°C |
| Storage Temperature Range | -15°C to 60°C |
Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.
Availability & grid compliance in Yemen
| Market | Yemen |
| Grid authority / regulator | Public Electricity Corporation (PEC), Ministry of Electricity and Energy |
| Quotation currency | YER |
| Support hours timezone | Asia/Aden |
| Delivery & installation coverage | Sana'a, Aden, Taiz, Al Hudaydah, Mukalla |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Yemen that is Public Electricity Corporation (PEC), Ministry of Electricity and Energy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.