Voltronic Power Solutions

Voltronic Power AXPERT-MKS-TWIN-LV-AXPERT-MKS-5-TWIN-LV-3.6K

The Axpert MKS TWIN LV Axpert MKS 5 TWIN LV 3.6K is an off-grid solar inverter rated Axpert MKS 5 TWIN LV 3.6K.

Models Covered: AXPERT-MKS-TWIN-LV-AXPERT-MKS-5-TWIN-LV-3.6K

Manufacturer: Voltronic Power

Application: The Axpert MKS TWIN LV Axpert MKS 5 TWIN LV 3.6K is an off-grid solar inverter rated Axpert MKS 5 TWIN LV 3.6K. Every figure on this page is read from the manufacturer's manual for the Axpert MKS TWIN LV series.

Technical Specifications

Technical Specifications
Parameter AXPERT-MKS-TWIN-LV-AXPERT-MKS-5-TWIN-LV-3.6K
Electrical / AC Output Data
Selectable Voltage Range 95-140 VAC (For Personal Computers) 65-140 VAC (For Home Appliances)
AC Voltage Regulation (Battery Mode) 120VAC ±5%
Output Waveform Pure sine wave
Overload Capability 5s@≥150% load; 10s@110%~150% load; 100ms @ ≥200% load
Transfer / Switchover Time 10 ms (For Personal Computers) ; 20 ms (For Home Appliances)
PV String Input Data
Max PV Array Power 7200W
Max PV Input Current 27A
Solar Charger Type MPPT
Max PV Open-Circuit Voltage 500 VDC
Battery Data
Max AC Charge Current 70A
Floating / Constant Charge Voltage 54 VDC
Additional Specifications
Maxmum Solar Charge Current 120 A
Maximum Charge Current 120 A
Efficiency (Peak) 93 %
Mechanical Data
Net Weight 12.0
Dimensions (W×H×D) 140 x 295 x 468
Operating Conditions
Relative Humidity 5% to 95% Relative Humidity(Non-condensing)
Operating Temperature -10°C to 50°C
Storage Temperature Range -15°C to 60°C

Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.

Availability & grid compliance in Sudan

Market Sudan
Grid authority / regulator Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum
Quotation currency SDG
Support hours timezone Africa/Khartoum
Delivery & installation coverage Khartoum, Omdurman, Port Sudan, Kassala, Nyala

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Sudan that is Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.