Voltronic Power Solutions

Voltronic Power AXPERT-MAX-II-DUPLEX-S-8K

The Axpert MAX II Duplex S Axpert Max II Duplex S 8K is a hybrid solar inverter rated Axpert Max II Duplex S 8K.

Models Covered: AXPERT-MAX-II-DUPLEX-S-8K

Manufacturer: Voltronic Power

Application: The Axpert MAX II Duplex S Axpert Max II Duplex S 8K is a hybrid solar inverter rated Axpert Max II Duplex S 8K. Every figure on this page is read from the manufacturer's manual for the Axpert MAX II Duplex S series.

Technical Specifications

Technical Specifications
Parameter AXPERT-MAX-II-DUPLEX-S-8K
Electrical / AC Output Data
Selectable Voltage Range 170-280 VAC (For Personal Computers) 90-280 VAC (For Home Appliances)
AC Voltage Regulation (Battery Mode) 230VAC ± 5%
Surge / Peak Power 16000VA
Output Waveform Pure sine wave
Transfer / Switchover Time 10 ms (For Personal Computers) ; 20 ms (For Home Appliances)
PV String Input Data
Max PV Array Power 8000W (4000W x 2)
Max PV Input Current 27A x 2 (MAX 40A)
Nominal DC Voltage 12 VDC ±5%, 100W
Max PV Open-Circuit Voltage 500 VDC
Additional Specifications
Maxmum Solar Charge Current 150A
Maximum Charge Current 150A
Efficiency (Peak) 93%
Battery Data
Max AC Charge Current 120A
Floating / Constant Charge Voltage 54 VDC
Protection Features
Safety / EMC Standards CE, NRS 097-2-1:2017
Mechanical Data
Dimensions (W×H×D) 147.4x 432.5 x 553.6
Net Weight 18.4
Operating Conditions
Relative Humidity 5% to 95% Relative Humidity(Non-condensing)
Operating Temperature -10°C to 50°C
Storage Temperature Range -15°C to 60°C

Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.

Availability & grid compliance in Yemen

Market Yemen
Grid authority / regulator Public Electricity Corporation (PEC), Ministry of Electricity and Energy
Quotation currency YER
Support hours timezone Asia/Aden
Delivery & installation coverage Sana'a, Aden, Taiz, Al Hudaydah, Mukalla

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Yemen that is Public Electricity Corporation (PEC), Ministry of Electricity and Energy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.