Parameter AXPERT-MAX-II-DUPLEX-S-8K
PV String Input Data
Max PV Array Power 8000W (4000W x 2)
Max PV Input Current 27A x 2 (MAX 40A)
Max PV Open-Circuit Voltage 500 VDC
Nominal DC Voltage 12 VDC ±5%, 100W
Electrical / AC Output Data
Surge / Peak Power 16000VA
Transfer / Switchover Time 10 ms (For Personal Computers) ; 20 ms (For Home Appliances)
Output Waveform Pure sine wave
AC Voltage Regulation (Battery Mode) 230VAC ± 5%
Selectable Voltage Range 170-280 VAC (For Personal Computers) 90-280 VAC (For Home Appliances)
Battery Data
Max Charge Current 150A
Max Solar / PV Charge Current 150A
Floating / Constant Charge Voltage 54 VDC
Max AC Charge Current 120A
Protection Features
Safety / EMC Standards CE, NRS 097-2-1:2017
Mechanical Data
Dimensions (W×H×D) 147.4x 432.5 x 553.6 mm
Net Weight 18.4 kg
Operating Conditions
Operating Temperature -10°C to 50°C
Relative Humidity 5% to 95% Relative Humidity(Non-condensing)
Storage Temperature Range -15°C to 60°C

Note: Specifications are based on the official Voltronic Power AXPERT-MAX-II-DUPLEX-S-8K datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Egypt

Market Egypt
Grid authority / regulator EgyptERA, NREA
Quotation currency EGP
Support hours timezone Africa/Cairo
Delivery & installation coverage Cairo, Alexandria, Giza, Aswan

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Egypt that is EgyptERA, NREA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.