Voltronic Power AXPERT-MKS-PLUS-PF1-AXPERT-MKS-2K-24/2K-48/3K-24/3K-48-PLUS

The Axpert MKS Plus PF1 Axpert MKS 2K-24 Plus is a off-grid solar inverter rated Axpert MKS 2K-24 Plus. Every figure on this page is read from the manufacturer'

Models Covered: AXPERT-MKS-PLUS-PF1-AXPERT-MKS-2K-24-PLUS, AXPERT-MKS-PLUS-PF1-AXPERT-MKS-2K-48-PLUS, AXPERT-MKS-PLUS-PF1-AXPERT-MKS-3K-24-PLUS, AXPERT-MKS-PLUS-PF1-AXPERT-MKS-3K-48-PLUS

Manufacturer: Voltronic Power

Application: The Axpert MKS Plus PF1 Axpert MKS 2K-24 Plus is a off-grid solar inverter rated Axpert MKS 2K-24 Plus. Every figure on this page is read from the manufacturer's manual for the Axpert MKS Plus PF1 series.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter AXPERT-MKS-PLUS-PF1-AXPERT-MKS-2K-24-PLUSAXPERT-MKS-PLUS-PF1-AXPERT-MKS-2K-48-PLUSAXPERT-MKS-PLUS-PF1-AXPERT-MKS-3K-24-PLUSAXPERT-MKS-PLUS-PF1-AXPERT-MKS-3K-48-PLUS
Electrical / AC Output Data
Max Efficiency 98%
Rated AC Power 2000VA/2000W2000VA/2000W3000VA/3000W3000VA/3000W
AC Voltage Regulation (Battery Mode) 230VAC ± 5%
Selectable Voltage Range 170-280 VAC (For Personal Computers)
Battery Data
Max Solar / PV Charge Current 60A
Mechanical Data
Net Weight 11.5 kg
Operating Conditions
Operating Temperature 0°C -55°C
Relative Humidity 5% to 95%

Note: Specifications are based on the official Voltronic Power AXPERT-MKS-PLUS-PF1-AXPERT-MKS-2K-24/2K-48/3K-24/3K-48-PLUS datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Syria

Market Syria
Grid authority / regulator Ministry of Electricity Syria
Quotation currency SYP
Support hours timezone Asia/Damascus
Delivery & installation coverage Damascus, Aleppo, Homs

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Syria that is Ministry of Electricity Syria. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.