The Axpert MAX II 6.5KW is a solar inverter rated 6.5KW. Every figure on this page is read from the manufacturer's manual for the Axpert MAX II series.

Models Covered: AXPERT-MAX-II-6.5KW

Manufacturer: Voltronic Power

Application: The Axpert MAX II 6.5KW is a solar inverter rated 6.5KW. Every figure on this page is read from the manufacturer's manual for the Axpert MAX II series.

Technical Specifications

Technical Specifications
Parameter AXPERT-MAX-II-6.5KW
Electrical / AC Output Data
Max AC Input Current 60A
Line Mode Efficiency >95% (Rated R load,
Low Line Disconnect 90Vac±7V (UPS) 80Vac±7V (Appliances)
Low Line Re-connect 100Vac±7V (UPS); 90Vac±7V (Appliances)
High Line Disconnect 140Vac±7V
High Line Re-connect 135Vac±7V
AC Input Voltage 150Vac
Grid / AC Frequency 50Hz/60Hz (
Transfer / Switchover Time 10ms typical 20ms typical (
Additional Specifications
Nominal Input Voltage 120Vac
Low Loss Frequency 40±
Low Loss Return Frequency 42±
High Loss Frequency 65±
High Loss Return Frequency 63±
Output Short Circuit Protection Line mode: Circuit Battery mode:
Max. Input Current 18A x
Max. PV Array Open Circuit Voltage 250Vdc
PV Array MPPT Voltage Range 90Vdc~230Vdc
Safety Compliance UL
Max parallel numbers 6
Power Unbalance Ratio <5% @ 100% Load
Floating Charging Voltage 54Vdc
Peak Efficiency 93%
Surge Capacity 2* rated power for 5 seconds
Low DC Cut-off Voltage 44Vdc
Nominal DC Input Voltage 48Vdc
Parallel communication CAN
Parallel Kit YES

Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.

Availability & grid compliance in Sudan

Market Sudan
Grid authority / regulator Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum
Quotation currency SDG
Support hours timezone Africa/Khartoum
Delivery & installation coverage Khartoum, Omdurman, Port Sudan, Kassala, Nyala

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Sudan that is Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.