Voltronic Power Solutions

Voltronic Power AXPERT-MAX-DUPLEX-S-11K

The Axpert MAX Duplex S Axpert Max Duplex S 11K is a hybrid solar inverter rated Axpert Max Duplex S 11K.

Models Covered: AXPERT-MAX-DUPLEX-S-11K

Manufacturer: Voltronic Power

Application: The Axpert MAX Duplex S Axpert Max Duplex S 11K is a hybrid solar inverter rated Axpert Max Duplex S 11K. Every figure on this page is read from the manufacturer's manual for the Axpert MAX Duplex S series.

Technical Specifications

Technical Specifications
Parameter AXPERT-MAX-DUPLEX-S-11K
Electrical / AC Output Data
Selectable Voltage Range 170-280 VAC (For Personal Computers) 90-280 VAC (For Home Appliances)
AC Voltage Regulation (Battery Mode) 230VAC ± 5%
Surge / Peak Power 22000VA
Output Waveform Pure sine wave
Transfer / Switchover Time 10 ms (For Personal Computers), 20 ms (For Home Appliances)
PV String Input Data
Max PV Array Power 11000W (5500W x 2)
Max PV Input Current 27A x 2(MAX 40A)
Max PV Open-Circuit Voltage 500 VDC
Additional Specifications
Maxmum Solar Charge Current 150A
Maximum AC Charge Current 150A
Maximum Charge Current 150A
Efficiency (Peak) 93%
Protection Features
Safety / EMC Standards CE, NRS 097-2-1:2017
Battery Data
Floating / Constant Charge Voltage 54 VDC
Mechanical Data
Net Weight 18.4
Dimensions (W×H×D) 147.4 x 432.5 x 553.6
Operating Conditions
Relative Humidity 5% to 95% Relative Humidity(Non-condensing)
Operating Temperature -10°C to 50°C
Storage Temperature Range -15°C to 60°C

Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.

Availability & grid compliance in Sudan

Market Sudan
Grid authority / regulator Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum
Quotation currency SDG
Support hours timezone Africa/Khartoum
Delivery & installation coverage Khartoum, Omdurman, Port Sudan, Kassala, Nyala

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Sudan that is Sudanese Electricity Distribution Company (SEDC), Ministry of Energy and Petroleum. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.