Voltronic Power AXPERT-MAX-DUPLEX-S-11K
The Axpert MAX Duplex S Axpert Max Duplex S 11K is a hybrid solar inverter rated Axpert Max Duplex S 11K. Every figure on this page is read from the manufacture
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-MAX-DUPLEX-S-11K |
|---|---|
| PV String Input Data | |
| Max PV Array Power | 11000W (5500W x 2) |
| Max PV Input Current | 27A x 2(MAX 40A) |
| Max PV Open-Circuit Voltage | 500 VDC |
| Electrical / AC Output Data | |
| Surge / Peak Power | 22000VA |
| Transfer / Switchover Time | 10 ms (For Personal Computers), 20 ms (For Home Appliances) |
| Output Waveform | Pure sine wave |
| AC Voltage Regulation (Battery Mode) | 230VAC ± 5% |
| Selectable Voltage Range | 170-280 VAC (For Personal Computers) 90-280 VAC (For Home Appliances) |
| Battery Data | |
| Max Charge Current | 150A |
| Max Solar / PV Charge Current | 150A |
| Floating / Constant Charge Voltage | 54 VDC |
| Max AC Charge Current | 150A |
| Protection Features | |
| Safety / EMC Standards | CE, NRS 097-2-1:2017 |
| Mechanical Data | |
| Dimensions (W×H×D) | 147.4 x 432.5 x 553.6 mm |
| Net Weight | 18.4 kg |
| Operating Conditions | |
| Operating Temperature | -10°C to 50°C |
| Relative Humidity | 5% to 95% Relative Humidity(Non-condensing) |
| Storage Temperature Range | -15°C to 60°C |
Note: Specifications are based on the official Voltronic Power AXPERT-MAX-DUPLEX-S-11K datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Morocco
| Market | Morocco |
| Grid authority / regulator | ONEE Morocco |
| Quotation currency | MAD |
| Support hours timezone | Africa/Casablanca |
| Delivery & installation coverage | Casablanca, Rabat, Marrakech, Tangier |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Morocco that is ONEE Morocco. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.