Voltronic Power AXPERT-VM-II-AXPERTVMII5000-48
The Axpert VM II AxpertVMII5000-48 is a off-grid solar inverter rated AxpertVMII5000-48. Every figure on this page is read from the manufacturer's manual for th
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-VM-II-AXPERTVMII5000-48 |
|---|---|
| PV String Input Data | |
| Max PV Array Power | 5000 W |
| MPPT Voltage Range | 120-450 VDC |
| Max PV Open-Circuit Voltage | 500 VDC |
| Electrical / AC Output Data | |
| Surge / Peak Power | 10000VA |
| Output Waveform | Pure sine wave |
| AC Voltage Regulation (Battery Mode) | 230VAC ± 5% |
| Battery Data | |
| Max Charge Current | 100 A |
| Max Solar / PV Charge Current | 100 A |
| Floating / Constant Charge Voltage | 54 VDC |
| Max AC Charge Current | 100 A |
| Mechanical Data | |
| Net Weight | 10 kg |
| Operating Conditions | |
| Operating Temperature | -10°C to 50°C |
| Storage Temperature Range | -15°C to 60°C |
Note: Specifications are based on the official Voltronic Power AXPERT-VM-II-AXPERTVMII5000-48 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Saudi Arabia
| Market | Saudi Arabia |
| Grid authority / regulator | SEC, ECRA, SASO |
| Quotation currency | SAR |
| Support hours timezone | Asia/Riyadh |
| Delivery & installation coverage | Riyadh, Jeddah, Dammam, Mecca, Medina |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Saudi Arabia that is SEC, ECRA, SASO. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.