Voltronic Power INFINISOLARV-INFINISOLAR-V-3K-48
The InfiniSolarV InfiniSolar V-3K-48 is a on-grid solar inverter rated InfiniSolar V-3K-48. Every figure on this page is read from the manufacturer's manual for
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | INFINISOLARV-INFINISOLAR-V-3K-48 |
|---|---|
| PV String Input Data | |
| Max PV Array Power | 4000W |
| Electrical / AC Output Data | |
| Rated Apparent Power | 3000W VA |
| AC Output Voltage | 220/230/240 VAC |
| Max Conversion Efficiency (DC/AC) | 90% |
| Output Waveform | 93% |
| Parallel Capability | Yes |
| Max AC Input Current | 30A |
| Power Factor | > 0.99 |
| Operating Conditions | |
| Operating Temperature | 0~90% RH (Non-condensing) °C |
| Communication | |
| Communication Interface | USB or RS232/Dry-Contact |
Note: Specifications are based on the official Voltronic Power INFINISOLARV-INFINISOLAR-V-3K-48 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Oman
| Market | Oman |
| Grid authority / regulator | Authority for Electricity Regulation Oman |
| Quotation currency | OMR |
| Support hours timezone | Asia/Muscat |
| Delivery & installation coverage | Muscat, Salalah, Sohar |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Oman that is Authority for Electricity Regulation Oman. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.