Voltronic Power INFINISOLAR-V-II-SPLIT-PHASE-INFINISOLAR-V-II-6KW
The InfiniSolar V II Split Phase InfiniSolar V II 6kw is a hybrid solar inverter rated InfiniSolar V II 6kw. Every figure on this page is read from the manufact
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | INFINISOLAR-V-II-SPLIT-PHASE-INFINISOLAR-V-II-6KW |
|---|---|
| PV String Input Data | |
| Max PV Input Power | 6000W |
| Start-up Voltage | 110VDC/120 VDC |
| Electrical / AC Output Data | |
| Rated Apparent Power | 6000W VA |
| AC Output Voltage | 110-120VAC (L-N) / 220-240VAC (L1-L2) |
| Max Conversion Efficiency (DC/AC) | 95% |
| Nominal Output Current | 27.3A for 110VAC, 25A for 120VAC |
| Power Factor | >0.99 |
| Battery Data | |
| Max Charge Current | 120A |
| Max Charge Power | 5000W |
| Max Solar / PV Charge Current | 120A |
| Max AC Charge Current | 120A |
| Operating Conditions | |
| Operating Temperature | -10°C to 50°C |
| Relative Humidity | 0~90% RH (Non-condensing) |
| Communication | |
| Communication Interface | USB/RS-232/RS-485/WiFi/ |
Note: Specifications are based on the official Voltronic Power INFINISOLAR-V-II-SPLIT-PHASE-INFINISOLAR-V-II-6KW datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Oman
| Market | Oman |
| Grid authority / regulator | Authority for Electricity Regulation Oman |
| Quotation currency | OMR |
| Support hours timezone | Asia/Muscat |
| Delivery & installation coverage | Muscat, Salalah, Sohar |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Oman that is Authority for Electricity Regulation Oman. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.