Voltronic Power AXPERT-KING-3/5K

The Axpert King Axpert King 3K is a off-grid solar inverter rated Axpert King 3K. Every figure on this page is read from the manufacturer's manual for the Axper

Models Covered: AXPERT-KING-3K, AXPERT-KING-5K

Manufacturer: Voltronic Power

Application: The Axpert King Axpert King 3K is a off-grid solar inverter rated Axpert King 3K. Every figure on this page is read from the manufacturer's manual for the Axpert King series.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter AXPERT-KING-3KAXPERT-KING-5K
PV String Input Data
MPPT Voltage Range 60~115VDC
Electrical / AC Output Data
Max Efficiency 93% at
Rated AC Power 3000VA/3000W5000VA/5000W
Surge / Peak Power 6000VA for 5 sec10000VA for 5 sec
Input Voltage Range 110-280 VAC
Parallel Capability Up to 9 units
THD / THDi ≤ 3% for linear load, 8% for non-linear load
Mechanical Data
Dimensions (W×H×D) 303 x 525 x 140 mm
Net Weight 13.0 kg13.5 kg
Operating Conditions
Operating Temperature 0°C to 55°C
Relative Humidity 5% to 95%
Storage Temperature Range -15°C to 60°C
Communication
Communication Interface USB/RS232/RS485/Bluetooth/Dry-contact

Note: Specifications are based on the official Voltronic Power AXPERT-KING-3/5K datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Oman

Market Oman
Grid authority / regulator Authority for Electricity Regulation Oman
Quotation currency OMR
Support hours timezone Asia/Muscat
Delivery & installation coverage Muscat, Salalah, Sohar

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Oman that is Authority for Electricity Regulation Oman. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.