Voltronic Power OTIMAII-TOWER-T-1.5K
The OtimaII Tower T 1.5K is a ups rated T 1.5K. Every figure on this page is read from the manufacturer's manual for the OtimaII Tower series.
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | OTIMAII-TOWER-T-1.5K |
|---|---|
| General Data | |
| Outlets / Output Connectors | 110/115/120/127 VAC or 200/208/220/230/240 VAC |
| Electrical / AC Output Data | |
| Transfer / Switchover Time | Typical 2-6 ms, 10ms max. |
| AC Frequency Range | 60/50 Hz ± 5 Hz (auto sensing) |
| AC Output Voltage | ±1.5% (before battery alarm) V |
| Efficiency | 95% |
| ECO Mode | 97% |
| Protection Features | |
| Safety / EMC Standards | 397x 145 x 220 |
| Mechanical Data | |
| Net Weight | 12.1 kg |
| Operating Conditions | |
| Max Altitude | 0~3000m, 10% de-rating for over 1000m |
| Noise Level | Less than 45dB |
Note: Specifications are based on the official Voltronic Power OTIMAII-TOWER-T-1.5K datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Netherlands
| Market | Netherlands |
| Grid authority / regulator | ACM Netherlands |
| Quotation currency | EUR |
| Support hours timezone | Europe/Amsterdam |
| Delivery & installation coverage | Amsterdam, Rotterdam, The Hague, Utrecht |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Netherlands that is ACM Netherlands. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.