Voltronic Power AXPERT-VM-TWIN-AXPERT-VM-4-TWIN-4K

The Axpert VM TWIN Axpert VM 4 TWIN 4K is a off-grid solar inverter rated Axpert VM 4 TWIN 4K. Every figure on this page is read from the manufacturer's manual

Models Covered: AXPERT-VM-TWIN-AXPERT-VM-4-TWIN-4K

Manufacturer: Voltronic Power

Application: The Axpert VM TWIN Axpert VM 4 TWIN 4K is a off-grid solar inverter rated Axpert VM 4 TWIN 4K. Every figure on this page is read from the manufacturer's manual for the Axpert VM TWIN series.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter AXPERT-VM-TWIN-AXPERT-VM-4-TWIN-4K
PV String Input Data
Max PV Array Power 5000W 6000W
Max PV Input Current 27A
Electrical / AC Output Data
Surge / Peak Power 8000VA 12000VA
Output Waveform Pure sine wave
AC Voltage Regulation (Battery Mode) 230VAC ±10%
Selectable Voltage Range 170-280 VAC (For Personal Computers) 90-280 VAC (For Home Appliances)
Battery Data
Max Charge Current 120A 120A
Max Solar / PV Charge Current 120A 120A
Max AC Charge Current 100A 100A
Operating Conditions
Operating Temperature -10°C to 50°C
Relative Humidity 5% to 95% Relative Humidity (Non-condensing)
Storage Temperature Range -15°C to 60°C

Note: Specifications are based on the official Voltronic Power AXPERT-VM-TWIN-AXPERT-VM-4-TWIN-4K datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Lebanon

Market Lebanon
Grid authority / regulator EDL Lebanon
Quotation currency LBP
Support hours timezone Asia/Beirut
Delivery & installation coverage Beirut, Tripoli, Sidon

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Lebanon that is EDL Lebanon. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.