Voltronic Power SCC-MPPT-300W / SCC-MPPT-600W / SCC-MPPT-850W

The SCC MPPT SCC-MPPT 300W is a solar charge controller rated SCC-MPPT 300W. Every figure on this page is read from the manufacturer's manual for the SCC MPPT s

Models Covered: SCC-MPPT-300W, SCC-MPPT-600W, SCC-MPPT-850W

Manufacturer: Voltronic Power

Application: The SCC MPPT SCC-MPPT 300W is a solar charge controller rated SCC-MPPT 300W. Every figure on this page is read from the manufacturer's manual for the SCC MPPT series.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter SCC-MPPT-300WSCC-MPPT-600WSCC-MPPT-850W
Electrical / AC Output Data
Max Efficiency 98%
Max Current 17A
Battery Data
Max Charge Current 20A
Protection Features
IP Rating IP 43
Overcharge Protection Yes
Overload Protection > 110% audible alarm
Mechanical Data
Dimensions (W×H×D) 170 x 57.5 x 135 mm170 x 57.5 x 220 mm170 x 57.5 x 220 mm
Weight 0.92 kg1.85 kg1.85 kg
Operating Conditions
Relative Humidity IP 31%
Storage Temperature Range -20°C to 55°C0°C to 55°C-40°C to 75°C

Note: Specifications are based on the official Voltronic Power SCC-MPPT-300W / SCC-MPPT-600W / SCC-MPPT-850W datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Kuwait

Market Kuwait
Grid authority / regulator MEW Kuwait
Quotation currency KWD
Support hours timezone Asia/Kuwait
Delivery & installation coverage Kuwait City, Hawalli, Salmiya

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Kuwait that is MEW Kuwait. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.