Voltronic Power AXPERT-VM-III-TWIN-PV40A-VM-III-4000-TWIN-PV-5600
The Axpert VM III TWIN PV40A VM III-4000 TWIN-PV 5600 is a off-grid solar inverter rated VM III-4000 TWIN-PV 5600. Every figure on this page is read from the ma
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-VM-III-TWIN-PV40A-VM-III-4000-TWIN-PV-5600 |
|---|---|
| PV String Input Data | |
| Max PV Array Power | 5600W |
| Max PV Input Current | 40A |
| Electrical / AC Output Data | |
| Max Efficiency | 93% |
| Rated AC Power | 4000VA/4000W |
| Surge / Peak Power | 8000VA |
| AC Voltage Regulation (Battery Mode) | 230VAC ±10% |
| Selectable Voltage Range | 170-280 VAC (For Personal Computers) |
| Battery Data | |
| Max Charge Current | 120A |
| Max Solar / PV Charge Current | 120A |
| Max AC Charge Current | 100A |
| Operating Conditions | |
| Operating Temperature | -10°C to 50°C |
| Relative Humidity | 5% to 95% |
| Storage Temperature Range | -15°C to 60°C |
| Communication | |
| Communication Interface | USB/RS232/RS485/WiFi/Dry-contact |
Note: Specifications are based on the official Voltronic Power AXPERT-VM-III-TWIN-PV40A-VM-III-4000-TWIN-PV-5600 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Kuwait
| Market | Kuwait |
| Grid authority / regulator | MEW Kuwait |
| Quotation currency | KWD |
| Support hours timezone | Asia/Kuwait |
| Delivery & installation coverage | Kuwait City, Hawalli, Salmiya |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Kuwait that is MEW Kuwait. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.