Voltronic Power AXPERT-VM-II-INVERTERAXPERTVMII1200-12
The Axpert VM II InverterAxpertVMII1200-12 is a off-grid solar inverter rated InverterAxpertVMII1200-12. Every figure on this page is read from the manufacturer
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-VM-II-INVERTERAXPERTVMII1200-12 |
|---|---|
| PV String Input Data | |
| Max PV Array Power | 2000W |
| MPPT Voltage Range | 60-300 VDC |
| Max PV Open-Circuit Voltage | 350 VDC |
| Electrical / AC Output Data | |
| Surge / Peak Power | 2400VA |
| Output Waveform | Pure sine wave |
| AC Voltage Regulation (Battery Mode) | 230VAC ± 5% |
| Selectable Voltage Range | 170 V – 280 V |
| Battery Data | |
| Max Charge Current | 80 A |
| Max Solar / PV Charge Current | 80 A |
| Floating / Constant Charge Voltage | 13.5 VDC |
| Max AC Charge Current | 80 A |
| Mechanical Data | |
| Net Weight | 6.5 kg |
| Operating Conditions | |
| Operating Temperature | -10°C to 50°C |
| Storage Temperature Range | -15°C to 60°C |
Note: Specifications are based on the official Voltronic Power AXPERT-VM-II-INVERTERAXPERTVMII1200-12 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Kuwait
| Market | Kuwait |
| Grid authority / regulator | MEW Kuwait |
| Quotation currency | KWD |
| Support hours timezone | Asia/Kuwait |
| Delivery & installation coverage | Kuwait City, Hawalli, Salmiya |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Kuwait that is MEW Kuwait. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.