Voltronic Power AXPERT-MAX-IND-12000
The Axpert MAX IND Axpert MAX IND 12000 is a off-grid solar inverter rated Axpert MAX IND 12000. Every figure on this page is read from the manufacturer's manua
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-MAX-IND-12000 |
|---|---|
| PV String Input Data | |
| Max PV Array Power | 15000W (7500W x 2) |
| Max PV Input Current | 27A x 2 (Max. 45A) |
| MPPT Voltage Range | 90-450 VDC |
| Electrical / AC Output Data | |
| Max Efficiency | 93% |
| Rated AC Power | 12000VA/12000W |
| Surge / Peak Power | 24000VA |
| Parallel Capability | YES, 6 units |
| AC Voltage Regulation (Battery Mode) | 230VAC ± 5% |
| Selectable Voltage Range | 170-280 VAC (For Computers) |
| Standby / Self-Consumption Power | <75W |
| Battery Data | |
| Max Charge Current | 200A |
| Max Solar / PV Charge Current | 200A |
| Max AC Charge Current | 200A |
| Protection Features | |
| IP Rating | IP54 |
| Safety / EMC Standards | IEC 62109, IEC 61683 |
| Mechanical Data | |
| Dimensions (W×H×D) | 463 x 741.3 x 140.8 mm |
| Weight | 28.0 kg |
| Operating Conditions | |
| Operating Temperature | -10°C to 50°C |
| Relative Humidity | 5% to 95% |
| Storage Temperature Range | -15°C to 60°C |
| Communication | |
| Communication Interface | USB/RS232/RS485/WiFi/Dry-contact |
Note: Specifications are based on the official Voltronic Power AXPERT-MAX-IND-12000 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Italy
| Market | Italy |
| Grid authority / regulator | ARERA Italy |
| Quotation currency | EUR |
| Support hours timezone | Europe/Rome |
| Delivery & installation coverage | Rome, Milan, Naples, Turin |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Italy that is ARERA Italy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.