Voltronic Power AXPERT-VM-TWIN-AXPERT-VM-4-TWIN-6K
The Axpert VM TWIN Axpert VM 4 TWIN 6K is a off-grid solar inverter rated Axpert VM 4 TWIN 6K. Every figure on this page is read from the manufacturer's manual
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-VM-TWIN-AXPERT-VM-4-TWIN-6K |
|---|---|
| PV String Input Data | |
| Max PV Array Power | 5000W 6000W |
| Max PV Input Current | 27A |
| Electrical / AC Output Data | |
| Surge / Peak Power | 8000VA 12000VA |
| Output Waveform | Pure sine wave |
| AC Voltage Regulation (Battery Mode) | 230VAC ±10% |
| Selectable Voltage Range | 170-280 VAC (For Personal Computers) 90-280 VAC (For Home Appliances) |
| Battery Data | |
| Max Charge Current | 120A 120A |
| Max Solar / PV Charge Current | 120A 120A |
| Max AC Charge Current | 100A 100A |
| Operating Conditions | |
| Operating Temperature | -10°C to 50°C |
| Relative Humidity | 5% to 95% Relative Humidity (Non-condensing) |
| Storage Temperature Range | -15°C to 60°C |
Note: Specifications are based on the official Voltronic Power AXPERT-VM-TWIN-AXPERT-VM-4-TWIN-6K datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Iraq
| Market | Iraq |
| Grid authority / regulator | Ministry of Electricity Iraq |
| Quotation currency | IQD |
| Support hours timezone | Asia/Baghdad |
| Delivery & installation coverage | Baghdad, Basra, Erbil, Mosul |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Iraq that is Ministry of Electricity Iraq. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.