Voltronic Power INFINISOLAR-VII-WP-2/3/5KW
The InfiniSolar VII WP 2KW is a solar inverter rated 2KW. Every figure on this page is read from the manufacturer's manual for the InfiniSolar VII WP series.
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | INFINISOLAR-VII-WP-2KW | INFINISOLAR-VII-WP-3KW | INFINISOLAR-VII-WP-5KW |
|---|---|---|---|
| General Data | |||
| Outlets / Output Connectors | 100% | PV1 | 25% |
| Electrical / AC Output Data | |||
| AC Frequency Range | < 10ms (for UPS) Hz | < 20ms (for home appliances) Hz | <50ms (for parallel system operation) Hz |
| Feed-in Grid Voltage Range | 220/230/240 VAC | ||
| Mechanical Data | |||
| Weight | 22.5 kg | ||
Note: Specifications are based on the official Voltronic Power INFINISOLAR-VII-WP-2/3/5KW datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Spain
| Market | Spain |
| Grid authority / regulator | CNMC Spain |
| Quotation currency | EUR |
| Support hours timezone | Europe/Madrid |
| Delivery & installation coverage | Madrid, Barcelona, Valencia, Seville |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Spain that is CNMC Spain. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.